Skip to content

docs(roadmap): make Paperclip S4=C constructor implementable and testable - #35

Merged
xLagerFeuer merged 6 commits into
mainfrom
docs/paperclip-s4-constructor-contract-20261117
Nov 17, 2026
Merged

xLagerFeuer merged 6 commits into
mainfrom
docs/paperclip-s4-constructor-contract-20261117

Conversation

@xLagerFeuer

Copy link
Copy Markdown
Member

Summary

The prior Paperclip architecture-first roadmap named a possible S4 model-release adaptation feature but did not define a sufficiently testable construction contract for the Methodology's C target. This change makes C engineering expectations explicit without redefining C in Profile/Skills or claiming an Index regrade.

Changed files

  • PROTOCOL.md: require a function-specific constructor/acceptance receipt whenever roadmap proposes an implementable C target; generic hooks/notifications never automatically qualify.
  • docs/CAPABILITY_ROADMAP.md: require first-party S4/S3/etc decision/feedback port, actual composable actor/authority, deployment reachability, return into operations, negative tests and native alternative; add a C-target receipt field.
  • docs/examples/paperclip-roadmap-20261117.md: link the exact implementation-readiness contract for P0 Paperclip S4; keep accepted Index vector S1=A S2=A S3=A(P) S3*=A S4=— S5=P unchanged.
  • docs/examples/paperclip-s4-constructor-acceptance-20261117.md: design candidate with source boundary, user counterfactual and five proposed first-party logical ports (signal, adaptation cases, agent decision composition, future-use application, actual next-run return), ten acceptance scenarios AC-01…AC-10, safety/authority controls and explicit no-grade gates.
  • CHANGELOG.md: unreleased documentation entry, no new release.

Traceability

  • Canonical Index Paperclip assessment merged PR #3235, fixed original source 7f9867895c4e7e9589b233a93aa9efceb0c992d0; downstream source master snapshot 904c01d1a3a16de817792432d5d5a24f6e4bde12 remains explicitly distinct.
  • Proposed Paperclip user need parallels existing original issue #20848, not a new external submission. Existing simpler-native workaround must first be screened, along with overlapping PRs and rights.
  • Skills Methodology 0.3.8 owns the real C meaning; this is an implementation target, not a grade/certification. Actual positive C, parent P or C(P) requires later shipped-source first-party assessment.
  • A human-only button, model release notification, source catalog or generic uninstalled plugin is explicitly insufficient for S4=C.

Validation and non-publication

  • Executed python3 scripts/validate_capability_roadmap.py on updated Paperclip receipt: PASS.
  • Verified contract includes all AC-01 to AC-10, retained plan-only/cost unmeasured, indexed source link, and correct resource/authority distinction.
  • No changes to Paperclip original, OpenSiro fork source, accepted Index grade, normative Profile/Skills, managed Upstream contribution state, metrics of product benefit, or third-party communication.
  • PLAN_ONLY; external issue DRAFT — NOT PUBLISHED; cost NOT_MEASURED.

@xLagerFeuer
xLagerFeuer merged commit 80da195 into main Nov 17, 2026
1 check passed
@xLagerFeuer
xLagerFeuer deleted the docs/paperclip-s4-constructor-contract-20261117 branch November 17, 2026 18:58
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant